项目变量 meaning in English
entry variable
Examples
- Contains information about a wizard project s variables
包含有关向导项目变量的信息。 - Saving solution and project variable values between integrated development environment sessions
在集成开发环境ide会话之间保存解决方案和项目变量值。 - To track the schedule at a detailed level , you can track some or all of the following project variables
如果要详细地跟踪日程,则可以跟踪下列项目变量的部分或全部。 - The project variables are resources people and money , schedule time , and features the product and its quality
三个项目变量分别为资源(人员和资金) 、时间表(时间)和功能(产品及其质量) 。 - A change to one of the project variables requires that the team make a correction on one of the three sides to maintain project balance , including potentially the same side on which the change first occurred
对项目变量中的一个进行更改将要求团队对三个边中的一条边进行更正以维护项目平衡,其中可能包括最初发生更改的那一条边。