×

蒸汽养护的 meaning in English

steam-cured

Examples

  1. Fabrication of the box beam is divided into such parts as reinforcement , formwork , concreting , prestressing , moving and storing of beam , pipe grouting under pressure , end sealing of the beam , water - proof layer on the bridge surface system , protective coating etc . the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects , such technologies as : manufacturing and fixing of reinforcement , steel reinforcement fixing baseplate , web plate and top plate respectively and lifting the steel skeleton into form , requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork , optimization of concrete ratio , concrete pouring process of two ends of beam in priority over the middle , in sequence of first baseplate followed by web plate and top plate at last , concrete pouring in inclined section and in horizontal layer , concrete vibration mainly by external vibrator in assistance with internal vibrator , methods and regulation for steam curing of concrete , dual controls over stress and strain to ensure quality of prestressing workmanship , construction method of effective beam moving by heavy - weight special moving facility , some regulations and key notes about construction of grouting under pressure , beam ends sealing , water - proof layer on the bridge surface system , protective coating
    箱梁制造由钢筋工程、模板工程、混凝土工程、预应力工程、移存梁工程、孔道压浆工程、梁体封端工程、桥面防水层和保护层工程等施工环节组成。文中介绍的采用胎具制作和绑扎钢筋,分底腹板和顶板分别绑扎并吊装钢筋骨架入模;拆装式和液压式两种模板的设计、制作要求和使用方法;综合考虑、优化混凝土配合比,混凝土灌注从两端至中间、先底板、后腹板、再顶板的施工顺序和斜向分段、腹板水平分层、附着式振捣为主、插入式捣固为辅的施工工艺,蒸汽养护的方法和规定;应力应变双控制确保预应力施工质量的施工技术;采用重物移运器有效移梁的施工方法;压浆、封端、桥面防水层和保护层施工的一些规定和注意事项等都是对箱梁制造行之有效的施工技术和施工方法,并可为以后类似施工作借鉴。
  2. The 5 batches with 31 groups of specimens were carried out four different curing systems including standard curing , hot water curing , dry heat curing and steam curing , and the regularity of rpc200 ' s strength with different curing conditions was studied . a conclusion was acquired by the experiment that the rpc200 ' s strength develops steadily in the steam curing which is mature and the economic benefits is more notable
    制作四批23组试件,进行了标准养护、热水养护、高温干热养护、蒸汽养护等四种不同的养护制度的对比试验,通过试验研究发现采用蒸汽养护的rpc200后期强度发展稳定,并且蒸汽养护技术成熟,养护设备无需改造就可用于rpc200构件的养护,具有显著的经济效益。

Related Words

  1. 道路养护
  2. 现场养护
  3. 热补养护
  4. 室外养护
  5. 养护管理
  6. 桥梁养护
  7. 公路养护
  8. 表面养护
  9. 湿度养护
  10. 养护机构
  11. 蒸汽氧脱碳法
  12. 蒸汽养护
  13. 蒸汽养护的混凝土
  14. 蒸汽养护混凝土
PC Version

Copyright © 2018 WordTech Co.