×

营运阶段 meaning in English

operation phase

Examples

  1. The successful proponent is required to comply with all the statutory requirements under the eiao during the planning , design , construction and operation stages by completing eia studies for the project , and obtaining environmental permit ( s ) for any schedule 2 designated project ( s ) prior to their construction and eventual operation . proponents should take this into account in their programme
    在施工及日后进行营运前,中选的建议者必须在规划、设计、建筑和营运阶段,完成该工程项目所需的各项环境影响评估研究,以及就附表2指定工程项目取得环境许可证,以符合《环境影响评估条例》的所有法例规定。
  2. It has also pounded the keys , devices , disposition of surveyed spots , measure method and procedures , data gathering and process ( relation with construction workmanship ) , error analysis and adjustment , control precision and rules , mechanism and method of control , tables of records , results and discussion . after completion , the bridge has good behaviors in dead loads state , cable forces , shape style of main beam , stress and strain of concerned sections , displacements of the tower top , which assure the reasonable state of cables , main girder and towers , and safe under running , demonstrate supervision
    通过课题研究与实桥运用,荆州长江公路大桥斜拉桥施工过程各状态和成桥恒载状态下,斜拉索索力、主梁线形、主梁关键截面应变、索塔塔顶水平偏位等关键项目的施工控制结果均满足设计期望值的要求,满足桥梁施工范围的要求,大桥主梁线形流畅,斜拉索、主梁和索塔三大体系的受力状态合理,桥梁结构安全可靠,大桥的监测监控取得了圆满成功,并为该桥营运阶段的长期监测监控奠定了良好的基础。

Related Words

  1. 营运
  2. 完全营运
  3. 航班营运
  4. 营运负担
  5. 营运整合
  6. 营运商
  7. 营运成本
  8. 营运余额
  9. 营运经理
  10. 营运功率
  11. 营运计画
  12. 营运计划
  13. 营运结余
  14. 营运经济计量模型
PC Version

Copyright © 2018 WordTech Co.