终凝 meaning in English
final setting
finl set
Examples
- Final setting time
终凝时间 - According to proper use method , install and operate , when the concrete not finally coagulated , the climbing - up and down is forbidden
应按正确使用方法安装施工,在混凝土未达到终凝时,禁止上下梯。 - Setting time of gypsum plaster is very short , usually only 6 ~ 30 min , and operation time is only 5 - 10 min , which cannot satisfy the practical plastering and construction of gypsum - based material
半水石膏凝结硬化很快,其初终凝时间为6 30分钟,可操作时间只有5 10分钟,往往不能满足石膏基材料的成型与施工的需要。 - Through flat experiment and circle experiment , we research the causes of cracks before hardening of concrete and after . through ingredient experiment , we research the influence of shrinkage from some ingredient ( coal ash , crushed stones and fiber ) . in addition , we test some methods of construction to strengthen the anti - crack capacity of r . c . slab in building sites
通过平板试验和圆环试验,研究了混凝土在终凝前和终凝后裂缝的各种影响因素;通过掺合料试验,研究混凝土的一些掺合料(粉煤灰、碎石和纤维)对其收缩变形的影响;另外,还在施工工地进行一些增强楼板抗裂能力的构造措施试验。 - In the study , a new kind inorganic anchoring material was developed , which consisted of special binder and aggregate , the former is made from clinker , blast furnace slag and compound admixture , and the later is superfine sand . effects of the factors such as clinker / slag , binder / sand , solution / binder and constituent of solution on the strength , set - time and contraction of the matrix made from the anchoring material were studied
上述分析研究得出以下结论:新型无机锚固材料具有早强、快硬、高强特点, 10h .抗压强度可达26 . 5mpa , 365天强度可达144 . 0mpa ;初凝时间在40min . 3h .之间,且初终凝时间差在15分钟以内;在保湿条件下具有微膨胀性,膨胀率在0 . 5 %以内。