系统锚固 meaning in English
pattern bolting
Examples
- In the excavating process of the left bank , such methods as concrete embolism , consolidation grouting > cable strengthening and bailing shoud be used when the fault f5 is round . on the right bank , the system anchorage and bailing methods shoud be used . it is surgested that the prestressed cable shoud be used to deal with the deterministic blocks . and the prestressed anchor to the undeterministic blocks
左岸拱肩槽边坡在开挖施工至断层f5附近时,要使用混凝土栓塞、固结灌浆、锚索加固及排水等措施以防止岩体失稳。右岸拱肩槽边坡开挖过程中要采取系统锚固及排水防渗等措施,以防止个别潜在不稳定的边坡失稳。