立模 meaning in English
erection of formwork
formwork erection
Examples
- Optimum level of construction completion on global optimization is not only the evaluating indicator but the critical factor in construction control
经过全局优化的最优施工完成度不单是一个评价指标,而且是施工控制中的关键因素;采用全局优化思想对施工过程中的立模标高进行控制。 - Based on the existing research achievement , the paper take the elevation of formwork as the objective vector for ann , and raises the construction calculation and control method of objective vector
借鉴现有的研究成果,确定以立模标高为神经网络的目标矢量,提出了目标矢量的组成、计算和调控方法。 - Applying a spatial nonlinear fem modeling , the actual cantilever construction process of the cable - stayed bridge concrete girders was simulated , the tension forces of cables and the initialize heights of girders during construction are obtained respectively
运用空间非线性有限元分析模型,模拟了混凝土斜拉桥主梁的悬臂浇筑过程,求出各施工阶段斜拉索的初始张拉力和主梁节段的立模标高。 - Furthermore , in control part , it owns analysis functions of design ( construction ) completion reasonable states and design ( construction ) segmental reasonable states , elevation of form erection or installation , simulation analysis , foresight of alarm and generalized optimization , among which , design of foresight of alarm will break through the difficulty of non - synchronism of
在控制模块中,具有设计(施工)结构合理状态、设计(施工)节段合理状态、立模(或安装)标高、仿真分析、预警及广义优化等多种功能模块。尤其对预警设计,率先解决了强度和稳定性不同步的问题,确保施工过程的强度、稳定性安全。 - At the finishing of this paper , the effective identification of designing factors is done and the setting elevation and the cable tension force in next stage are forecasted according to the situation of finished beams . through the forecasting , the constructing state is in coincidence with the designing state . during the bridge construction process , the value of designing parameters are made close to the construction state by means of data collections , optimal controls and detailed analysis of different reasons that caused errors
最后,根据施工的实际状态对设计参数进行了有效的识别,并利用灰色理论与预测控制相结合的方法,根据已浇梁段的实际状况对下一施工梁段的立模标高和斜拉索张拉索力进行预测,使施工过程中的受力状态与已确定的合理施工状态达到一致。