灌注速度 meaning in English
rate of flooding
Examples
- The precautions for the underwater concrete reinforcing cage up - floating accident is placing the reinforcing cage in the pile hole center , controlling the embedded depth of conduct pile , concrete casting velocity and conduce pipe drawing velocity , mixing fine quality concrete , adding barbed bar and specialized refincing cage hanger hook
采用对策是注意保证灌注导管位于钢筋笼中心,控制导管埋深、灌注速度及提升导管的速度,配制品质好的混凝土,以及采用“倒剌”方法和专用吊钩等预防措施。