混凝土斜拉桥 meaning in English
concrete deck cable stayed bridge
Examples
- Self - adaptive construction control analysis of pre - stressed concrete cable - stayed bridges
预应力混凝土斜拉桥自适应施工控制分析 - Binzhou yellow river bridge is a three - tower cable - stayed bridge with prestressed concrete girders
摘要滨州黄河大桥主桥是三塔预应力混凝土斜拉桥,主梁为预应力混凝土箱梁。 - The method can effectively evaluate whole structural performance and safety degree of concrete cable - stayed bridge
研究成果对于评价混凝土斜拉桥施工期的结构整体性能和安全程度具有参考价值。 - This thesis is mainly focused on the analysis method in numerical simulation of mechanic behavior of the long - span cable - stayed bridge in construction and the computer programming
本文重点研究了预应力混凝土斜拉桥在施工过程中的力学行为的数值模拟分析方法及其计算机程序实现。 - The seperated pair of main ribs section was made up by bridge panel and girder , because its construction is convenient , used widely in the prestressing force concrete cable - stay bridge of large span
回答:分离式双主肋截面是由桥面板与边主梁组合而成,由于其施工方便,在大跨度预应力混凝土斜拉桥中得到广泛应用。