浮吊 meaning in English
[机械工程] floating crane
Examples
- Cranes ; stability for all cranes except non - rail mounted mobile cranes and except floating cranes
起重机.第1部分:除无轨安装移动式起重机和浮吊之外的 - The 40t floating crane played a very important role in the construction of the whole bridge and solved many difficult problems
在全桥的施工过程中, 40t浮吊起到了非常大的作用,解决了许多施工难题。 - The design and implementation of caisson ' s integral launching through translatory moving by gasbag and craning by floating crane barge , together with the economic benefit are discussed
摘要叙述了气囊平移、浮吊整体吊运沉箱下水施工工艺的方案设计和实施及给工程施工带来的经济效益。 - In which , it gives inquiring of the construction of deep - water foundations and the usage of floating crane . the construction program of bridge pier foundation will be fixed according to the water depth . if the water depth is less than 4m , pier foundation will adopt the method of building island by earth filling ; if the water depth is more than 4m and there is over burden at river bed , at the same time , it has sufficient bearing capacity to load steel pipe pile , the steel pipe pile platform will be adopted
其中,对深水基础的施工及浮吊的使用进行了探讨,根据水深确定桥墩基础的施工方法,对水深不超过四米的桥墩基础,采用填土筑岛的方法:对水深大于四米,河床有覆盖层,且能保证钢管桩具有足够的承载力的桥墩,采用钢管桩平台;对主河道上河床没有覆盖层,钢管桩无法插打的桥墩,采用浮式平台。 - If there is no over burden at the river bed , the steel pipe pile cannot be inserted , the floating platform will be adopted , during overwater construction , the author ( using zhong - 60 floating box , etc . ) assembled 40t floating crane by his own design , in this way , the floating crane completed the work of overwater transporting and lifting , such as the transporting of s teel pipe pile , inserting , the erecting of overwater construction platform , overwater moving of drill grid crane , lifting of lifting box of cushion cap , pulling out of steel pipe pile
在水上作业中,作者利用中- 60浮箱等设备自行设计、拼制了40t浮吊,完成了水上运输、水上起重等作业,如钢管桩的运输、插打、水上施工平台的搭设、钻机吊车的水上转移、承台吊箱的起吊、钢管桩的拔除等作业。