泵量 meaning in English
displacement of pump
pump duty
pump volume
pumpage
Examples
- How many pumps were turned on should be based on the dynamic design according to project target . and how many pumps should be in operation in standard shut off procedure . it was approved that although the theoretical boundary of decline of groundwater level is 10m , the actual boundary is only about 6m
提出了一些与真空预压加固地基设计相关的概念和处理方法,如定义真空预压加固区场地形状系数,提出按加固土体体积来确定射流泵数量、根据工程需要动态设计开泵量、增加停泵标准中对开泵量的规定等设计思想等,论证了真空预压加固地基时地下水位下降的理论极限深度为10m ,而实际极限深度约为6m 。 - Based on the results of testing site , some problems of vacuum preloading was analyzed by plane strain finite element method . the relative stable seepage velocity field can be produced with the pumping time . the depth of negative pore - water pressure transferring increases with the pvds length
最后,对真空联合堆载预压的施工工艺进行了研究,提出了在真空联合堆载预压的中期,出水量已相对较少,可适当减少开泵量,并可采用停抽结合的变真空能量法,在不影响加固效果的前提下,可以大大节省用电量。