注入井 meaning in English
[油工] injection well
◇注入井试井 injectivity test
Examples
- Basic flooding pattern
基础注入井网 - Backup injection well
后备注入井 - ( 4 ) if separate the space from injection well to production well into three phase , and mark 0 - 200m as i , 200 - 500m as ii , 500 - 700m iii
( 4 )如果把注入井与生产井之间的距离分为三段,分别记为i ( 0一2001 。 - 7mpa / km in the center of the zone ( 6 ) in the hot dry rock geothermal energy extraction system , after the system start to operate , the normal stress of crack show the pronounced influence depending on the temperature ' s change in a month , there are a marked drop in temperature nearby the injection well , forming a lower stress area , with the heat extraction , the temperature ' s change even gradually , but the temperature descend quickly nearby the production well , forming a new lower stress area
( 6 )高温岩体地热开发中,裂缝面法向应力受温度变化的显著影响,在系统开始运行的一个月内,注入井附近区域其温度降低较快,形成低应力区;随开采时间的延长,其温度变化逐渐平缓,而生产井附近区域温度降低加快,逐渐形成新的低应力区。 - The basic procedure of an interwell radiotracer test is , to inject a proper radioisotope tagged tracer material into the injector together with the injected fluid ; the tracer material will follow the injected fluid and go through the same path of injection fluid penetrating the formation ; finally the tracer material will be produced at the producer ; then , collecting samples at well head of producer , tracer response can be observed ; by analyzing the response of tracer , the information on dynamics of injection fluid and reservoir geology can be obtained
放射性井间示踪测试的基本过程是:将一定量合适的放射性示踪剂介入注入流体,使其通过注入井进入地层并跟随注入流体穿越地层,最后被采油井采出;通过跟踪监测示踪剂在采油井上的响应,获得注水井-采油井之间流体和地层的信息。