楼面地价 meaning in English
land price in terms of per unit floorage
land value in terms of per unit floorage
Examples
- The application of floor - value ratio to calculate the value of floor
楼面地价比在楼面地价计算中的应用 - The study report assumes a price of $ 7 , 000sq ft for the development , based on total construction costs , inclusive of the canopy , of about $ 3 , 000sq ft and an accommodation value of around $ 4 , 000sq ft . if the plot ratio were to double , meaning if twice the floor area of buildings were to be constructed , maintaining an accommodation value of $ 4 , 000sq
评估报告中假设,发展项目的楼价约$ 7 , 000尺,总建筑成本连天篷约$ 3 , 000尺,故楼面地价约$ 4 , 000尺。如容积率提升一倍,即楼宇面积增加一倍,楼面地价维持$ 4 , 000 ,地价则提升一倍,而基金及营运收入等亦会相应增加。 - Apportioning the land - value of " high building " is a new project that has been brought up in recent years of our country . by systemic analysis of the necessity , the meanings , the theoretic foundations and the principles of apportioning the land - value of " high building " , i probe into the methods of apportioning the land - value of " high building " . on the base of experts " research and practical experience , and according to my own thinking , i bring forward the solution of " the distributive ratio of the land - value of floor " to apportion the land - value of " high building "
同时,对“高层建筑”地价分摊的内涵进行了详细的阐释,本文中“高层建筑”是特指一层以上(大于等于二层)的建筑物,包括高于一层的低层建筑、多层建筑及高层建筑;并提出“高层建筑”地价分摊实际上就是把一个平面地价空间化、立体化的问题,本文所探讨的“高层建筑”地价分摊也正是为了求取一幢建筑中各楼层应分摊的地价,这个地价就是楼层楼面地价; “高层建筑”地价分摊的影响因素和待分摊平面地价的内涵也是我们在进行“高层建筑”地价分摊前应了解的。 - Through sensitivity analysis , the sale price , the cost of construction , and the price of land are three most sensitive factors , so it is necessary to develop the project as soon as possible in order to occupy market s hares , enforce advertisement and try for domestic and foreign clients , strengthen program ' s management so as to control the cost of construction , and make the best use of preferential policies in order to obtain the land in a probable lower price
通过敏感性分析得知销售价格、建筑成本和楼面地价是构成影响本项目利润率的三大敏感性因素,并提出尽快开发建设以抢占市场先机、加强形象宣传以扩大影响和争取国际国内客户群、加强项目管理以控制建筑成本以及充分利用优惠政策以便能以尽量低的价格取得土地的一系列对策。