施工后的 meaning in English
post-construction
Examples
- Paints should be allowed to dry in accordance with the manufacture ' s recommendation before over coating
施工后的涂料在覆涂前应经过一定的干燥时间。这一时间由涂料制造商推荐。 - The author reviewed the operational experience and the basic technical indexes of the prime coat and slurry seal of a highway , briefly analyzed the common failing after constructing the prime coat and slurry seal , in addition to the key measure to ensure the construction quality
总结了高速公路透层、稀浆封层的施工经验,对透层、稀浆封层的主要技术指标进行了分析,并指出了透层、稀浆封层施工后的质量通病以及确保施工质量所采取的关键措施。 - We care about the ideas and preferences of our clients . for us , it would be an important source for the interior design . we would help you to make your dream house come true . by selecting the low pollution materials to reduce the harmful smell after the construction , we would strive to maintain the healthy interior environment
我们在乎业主的想法与美感,对我们而言,您的机能需求是最重要的设计构想来源.我们想帮你完成你的梦想住宅或空间.在室内建材的选择上,我们为业主挑选低污染的室内建材,以避免施工后的刺鼻味道 - In order to achieve the optimized tunneling approach , first , tunneling procedures , shift length , horizontal jet grouting length , bench length and space length between c and d part of crd method are optimized ; on the basis of these results , two kinds of tunneling schemes are calculated with three - dimensional fem and the optimized tunneling scheme is achieved . as results of the optimized scheme , the conclusion is made that the gas pipe above the tunnel of sk3 + 355 section is secure . the calculation results are verified through comparison of numerical simulation results and site - monitoring measurement data
为得出适合本段工程的最佳施工路线,利用大型有限元通用软件ansys对开挖顺序、开挖进尺、水平旋喷长度、台阶长度及crd工法施工的c 、 d部相错长度进行了有限元数值模拟和优化分析,并利用这些分析结果,进行了两个施工方案的三维有限元动态施工模拟,得出了较优的施工方案,并利用施工后的地表沉降槽曲线,对sk3 + 355断面处隧道上方的煤气管线的安全性进行了分析,得出了利用此施工方案施工不会造成此处煤气管线破坏的结论。