总时差 meaning in English
tf total float or target finish date
tf=total float
total float ("tf")
total slack time
Examples
- To display total slack graphically
如果要以图表方式显示总时差: - In the total slack field , zero duration indicates a critical task ( by default )
默认情况下, “总时差”域中的零工期代表关键任务。 - 3 . scroll or drag the divider bar to the right to view the free slack and total slack fields
3 .将拆分条向右滚动或拖动,查看“可用时差”域以及“总时差”域。 - By identifying tasks with total slack , you can shift resources from noncritical tasks to critical tasks
识别带有总时差的任务后,您可将资源从非关键任务移到关键任务。 - The amount of total slack for a task is indicated by a thick dark line that is attached to the bottom - right corner of the task bar
任务的总时差由附在任务条形图右下角的粗黑线表示。