急冷塔 meaning in English
quench tower
Examples
- The technology process : the waste , through operation stand , to be rationed into the standing majorcombustion room , being ignited by the ignition - burningmachine , upon the principal of burningthree t , fully burned in the major combustion room ( 800 - 1000 ) . the remaining waste gas afterburning via flue goes into secondary combustion room for further high temperature oxidizingcombustion . the gas flow after the secondary combustion goes into the highly effective cyclonedust remover , removing the bigger granule of dust , flowing into rapid - cooling spay and washing equipment to absorb acid gas
废弃物经操作台连续定量投入立式炉本全燃烧室,由点火文空燃烧机自动点火,根据三t原则在炉本体燃烧室( 800 - 1000 )以充分燃烧,焚烧后产生的残余废气经烟道进入二次燃烧室再经高温( 1100 - 1200 )氧化焚烧,经二次焚烧后的气体进入高效旋风除尘器,除去颗粒较大的粉尘后,进入急冷塔喷淋洗涤装置吸收酸性气体。