工程管理员 meaning in English
clerk of the works
Examples
- By using depth - measurable band drains , the supervision engineer or engineering managerial personnel can measure or spot check the embedded depth of each band drain after construction if they were not at site when band drains were being driven , thus improving the construction efficiency and ensuring the engineering quality
使用可测深型排水板可提高施工效率,当监理工程师或工程管理员不在现场对排水板打设进行直接监督和管理时,施工后可以对每根排水板埋设的深度进行测量或抽查,因而可有效控制和杜绝人为造成的偷工减料,确保施工和工程的质量。