实际进度计划 meaning in English
as-performed schedule
Examples
- As - performed schedule
实际进度计划 - Abstract : during treatment of a delayed schedule , specific deliberation of calculation on claim for extension of time should be paid attention to the following tasks ; because the critical path of a network might be changed from time to time and the appropriate utilization of float should be carefully considered in the actral schedule , therefore , the claim for extension of time can not be calculated only by the network , but the actual period where the cause of a delaed schedule is set should be considered , and should be calculated on the basis of the actual schedule which is approved by the supervising engineer
文摘:在工期延误处理时,工期索赔计算应特别注意:由于网络的关键线路可能发生变化,且实际进度计划要考虑时差的合理利用,因此工期索赔不能仅按网络图计算,而要考虑工期延误原因的实际发生时间,按经监理工程师批准的实际进度计划计算。 - The time of process in the traditional network planning of cpm is fixed . this kind of network model is unsuitable for some schedule analysis . after introducing some developments of the network planning technique , the concept of probability network planning ( pnp ) is adopted corresponding to the random in work procedure
在网络计划理论发展进程中, cpm网络与pert网络始终占据着重要的位置,但由于其对不确定因素未予以考虑或过于简化,使其在某些实际进度计划管理中存在着较大的偏差。