填土方 meaning in English
earth fill
Examples
- The major activities involved during the construction stage of the project are cut and fill earthworks , slope works , earth retaining walls , irrigation buffer lake , detention ponds and tanks , sand bunkers and golf course capping and turfing
2 . 3 . 1在工程项目的施工期内,主要的工程活动包括挖填土方工程斜坡工程护土墙灌溉缓冲湖静水塘缸沙坑及高尔夫球场的加盖草皮铺设。 - It brings ollt a fem model to calculate lateral earth pressures behide the integral - abutment with considering the inieraction of eallh and abdrient . aiming at the two inherent behavioral deficiencies inherent in all iabs " summer lateral earth . pressure increases after each temperature cycle ; and the settlement adjacent to each abutment develops after each temperatllre cyc1e , this article brings out two method to solve or relieve the above two problems
本文针对整体式桥台桥梁的台后填土存在着土压力逐年增大以及台后填土的沉降问题,建立了整体式桥台桥梁的台与土共同作用的有限元计算模型;并以台后填土为研究对象,提出两种主要处理方法:台后设置eps压缩层方案,选用台后土加筋或置换轻填土方案;通过有限元分析计算了季节性温度荷载变化下产生的位移在上述处理方法中对于台后土压力的影响。 - The calculated results show that the regularity of foundation has more influence on the behaviors of inverted siphon under unevenness state , and that the marked improvement to the behaviors of inverted siphon can be obtained by displacing soil adjusting the regularity of foundation , especially to the behaviors of bottom slab of inverted siphon
结果表明:地基不均匀对倒虹吸结构整体在正常使用阶段的受力状态具有较大影响,采用换填土方式改善地基均匀性对改善倒虹吸结构整体受力性能特别是底板受力状态具有显著作用。 - He has contributed significantly towards experimental research in a wide range of practical problems including slope stability , reinforced fill , retaining walls and excavation support systems , submarine pipelines , piling and ground treatment processes . his contributions in retaining walls and reinforced soils earned him the sir benjamin baker silver medal awarded by the uk institution of civil engineers
他对实验研究作出极大的贡献,研究课题实用性高而且广泛,包括边坡稳定、加固填土、护土墙和深基开挖支撑系统、海底管道、桩基础和地基处理。在护土墙及加固填土方面的研究使他赢得英国土木工程师学会的sirbenjaminbakersilvermedal 。 - The preventing flood and draining waterlogging plan of china - singapore suzhou industrial park by taking the following factors into consideration , such as the cost , the characteristics , the management , the full utilization of the land , and the investor ' s psychological influence etc , this plan was elaborated by comparing the program of connecting protective embankments with the program of filling pits with earth . 2
《中新苏州工业园区防洪排涝规划》通过对联圩方案及填土方案,在工程投资、运行管理、土地利用、工程特色以及对投资商心理影响等方面的综合比较,确定合理的工程方案。