基准日期 meaning in English

base date

Examples

  1. Parameter is a double - precision floating - point number that represents a date as the number of days before or after the base date , midnight , 30 december 1899
    参数是一个双精度浮点数,它将日期表示为基准日期1899年12月30日午夜之前或之后的天数。
  2. List of tasks with scheduled start and finish dates , baseline start and finish dates , and differences between scheduled and baseline dates
    任务列表,包括排定的开始日期、排定的完成日期、比较基准开始日期、比较基准完成日期以及排定日期与比较基准日期之间的差异
  3. Slippage can occur when a baseline plan is set and the actual dates subsequently entered for tasks are later than the baseline dates or the actual durations are longer than the baseline durations
    设置了比较基准后,如果输入的任务实际日期比基准日期晚,或者实际工期长于比较基准工期时,则发生进度落后。
  4. " lo " , " eo " , " mo " , . . . are the base cost indices or reference prices , expressed in the relevant currency of payment , each of which is applicable to the relevant tabulated cost element on the base date
    是基本费用指数或参照价格,以相应的支付货币表示,按照在基准日期时相关表中的费用因素的费用指数或参照价格确定。
  5. For example , - 0 . 5 and 0 . 5 both mean noon on 30 december 1899 because a day displacement of plus or minus zero days from the base date is still the base date , and a half day displacement from midnight is noon
    例如, - 0 . 5和0 . 5都表示1899年12月30日正午,因为相对于基准日期加零天或减零天的日偏移量仍然是基准日期,因此偏离午夜半天的偏移量是正午。

Related Words

  1. 基准位置
  2. 基准球面
  3. 基准当量
  4. 基准偏差
  5. 基准栅极
  6. 板基准
  7. 环境基准
  8. 基准接收机
  9. 立体基准
  10. 定位基准
  11. 基准热敏电阻
  12. 基准日
  13. 基准日期;基日
  14. 基准容量
PC Version

Copyright © 2018 WordTech Co.