×

基于活动的成本 meaning in English

activity-based cost

Examples

  1. Firstly the author makes an inquiry into cost and profit , founding a cost forecasting model based on activity . in chapter five , it is studied the constructive price based on enterprise performance , forming the fuzzy synthetic evaluation method firstly which combine enterprise performance and the constructive price . chapter six is on project risk , which building a model on risk evaluation to constructive price
    首先探讨的是成本和利润值的合理确定,提出了基于活动的成本预测模型;其次研究的是基于企业绩效的工程造价分析,首次将企业绩效水平与工程价格联系起来,提出了影响工程价格的绩效因素评价方法;最后探讨了项目风险影响因素,提出了工程造价风险评判的理论模型。
  2. In this paper , according to the common business procedure problems in enterprise ' s informatization construction , the method of active based cost is adopted to analyze the business procedures , and the corresponding principle and method are advanced . the analytic method is applied in swa and has gotten notable effect
    本文针对目前企业信息化工程的业务流程重构问题,提出了使用基于活动的成本分析法( abc法)以及使用abc法的原则、方法,并将其运用于西南铝的业务流程分析中,取得了显著效果。

Related Words

  1. 立基于
  2. 基于身份
  3. 基于语料库
  4. 基于网络系统
  5. 基于当前字幕
  6. 基于古典的
  7. 基于鲁棒
  8. 基于地学的信息系统
  9. 基于构件的软件工程
  10. 基于性能的协议
  11. 基于会话的
  12. 基于会话的邮政
  13. 基于活动的成本核算
  14. 基于活动的管理
PC Version

Copyright © 2018 WordTech Co.