×

坝顶高程 meaning in English

crest elevation
crest level
dcl

Examples

  1. The dam of mania hydroelectric project is a soil - rock dam with spreading gradation soil of core wall . the height of the dam apices is 4261 . 3m and the maximal height is 76
    满拉水利枢纽工程拦河坝为宽级配砾质土心墙土石坝,坝顶高程4261 . 3m ,最大坝高76 . 3m 。
  2. Abstract : the articles introduce the method of china and germany ; according to their conditions of natural geography environment and technique etc , to determine crest the elevation of earth dam
    摘要:文章介绍我国及德国根据自然环境、技术条件采用的确定土坝坝顶高程的方法。
  3. After the engineering slope was dug , several small plastic zone the designed rock - fill dam will coming in the temporary slope , because rock - fill dam change the stress field on a small degree . but a gravity dam will arouse a great area of plastic zone in the permanent slope , which will bring a stability problem . after detail and depth study , the rock - fill dam project is more compatible of the engineering geology condition in nuozadu hydraulic - power station ' s dam site
    工程边坡开挖后,拟定的堆石坝方案由于嵌入浅,应力的调整有限,塑性区主要分布在坝顶高程附近的较小范围内;而拟定的重力坝方案,由于嵌入深,引起了一定程度的应力调整,边坡岩体表层产生了松弛变形,塑性区主要分布在坝顶高程到坡顶前缘(永久边坡)的v ivb类岩体分布区。

Related Words

  1. 开挖边线及高程
  2. 道格拉斯坝
  3. 水田坝
  4. 崩坍坝
  5. 灰坝
  6. 坝肩
  7. 尼龙坝
  8. 鼓坝
  9. 中坝
  10. 党坝
  11. 坝顶
  12. 坝顶长度
  13. 坝顶搁墙
  14. 坝顶公路
PC Version

Copyright © 2018 WordTech Co.