坝长 meaning in English
dam length
Examples
- The upper reservoir had a concrete dam 400 ft . long and 138 ft . high with a storage of 175 , 000 , 000 gallons . the dam of the lower reservoir was modified and reconstructed from that of the former tai shing paper manufacturing co .
建成后分上、下两个水塘,上塘是用混凝土筑堤坝,坝长400尺,高138尺,存水量为1 - In nov . 1921 , the line from gejiu to caotu was opened . oct . 1928 , the branch line from jijie to linan was opened and this line was extended to shibing at oct . 1934 . these railway lines were called the gebishi railroad
该铁路公司得到铁路铺设和矿采的权利,可是因修建资金不足,推退到1915年才开工, 1921年11月完成了个旧经由鸡街蒙自到草坝长72 . 2公里的铁路。