国家重点工程 meaning in English
a state key project
national key project
state key project
Examples
- With such country s key project cooperation as the petrochemical industry trade , power industry , etc . , well received by user
在与石化行业电力行业等国家重点工程合作中,受到了用户的好评。 - The company has participated the designing , manufacturing and installing of the national key project pipelines and pipes for the thermal power 300mw machine set desulfurizing project
公司先后参与了国家重点工程管道,以及火电300mw机组脱硫工程管道的设计、制造和安装。 - Nhi not only supplies amounts of significant technology equipment for national key project construction , but also exports its products to more than 30 countries and regions spread five continents
公司不仅为国家重点工程建设提供大量的重大技术装备,产品还远销世界五大洲30多个国家和地区。 - The lc40 hplc and its engineering technology was applied to caidian hanjiang bridge , which successfully solved the shortages of hplc , such as poor pumping ability , lacking of volume stability . the hplc was pumped firstly in china ( over 100m in height and 250m in length ) , which gives an essential support for the produce and application of hplc
将研制开发出的高性能轻集料混武汉理工大学博士学位论文凝土及其工程应用关键技术应用于国家重点工程京珠高速公路蔡甸汉江大桥实际工程,成功解决了轻集料混凝土施工性能差、可泵性差、体积稳定性不良等应用中的关键技术难题,在我国首次实现了高强轻集料混凝土的长距离泵送施工。 - " field observation of high rock - fill dams and feedback data analysis " and " dynamic analysis of high earth and rock - fill dams and aseismatic measures " , the concepts and methods obtained in the above two consulting items were creative and evaluated by the ministry of electric power as being of international level . the research findings were adopted in such large - scale projects as the tianshengqiao water contral project , ming tombs water control project . dahe water contral project , ming tombs water control project , dahe water control project and lianhua water control project and awarded the second prize of scientific and technical advancement of the ministry of electric power . ( 2 ) the research on the stress - strain correlation of dam construction materials was awarded the second prize of scientific and technical advancement of the ministry of electric power . ( 3 ) the result of the field observation test and computational analysis for the tailing dam improvement project of xuzhou power plant was adopted by the east - china design institute of electric engineering with considerable economic benefit . ( 4 ) the result of the geotechnical test and data analysis of wenfu mine project was applied in the project with considerable economic benefit . ( 5 ) the field observation and data analysis of the kezier reservoir project provided a solid base for ensuring the normal operation and management of the reservoir
“高堆石坝原位观测和反溃分析研究”及“高土石坝动力分析及抗震工程措施研究”咨询项目提出了具有开拓性的观点与方法,经电力工业部鉴定评为国际先进水平,该两项成果已应用于天生桥、十三陵、大河、莲花等大型工程获电力工业部科技进步二等奖; “坝料土动力应力应变关系的研究”咨询项目获电力工业部科技进步二等奖, “徐州发电厂灰坝加固工程勘测试验与计算分析”咨询成果已被华东电力设计院设计采纳,工程效益显著; “瓮福磷石膏渣场工程土工试验与数值分析”咨询成果已应用于国家重点工程瓮福矿肥基地建设,效益显著; “克孜尔水库工程原型观测数据库与资料分析”咨询项目为水库运行与管理提供了有力保证。