后续工程 meaning in English
follow engineering
Examples
- The whole engineering has the most signality . it can offer useful reference and guidance for the coming engineering
此项工程的意义重大,对后续工程具有很高的借鉴和指导价值。 - Controls over the investment decision - making , designing and bidding links in the prophase of capital construction have relatively great influences upon the follow - up project cost control , but they are often neglected
建设前期的投资决策、设计与招投标环节控制对后续工程造价控制影响较大,但该过程常被忽视。 - Contractor will contract with the continual project : according to the requirements of drawing and design offered by designing institute , contractor will finish the following project items ( refer to project content ) to complete the total technological process by adopting including cost , material , time limit of project and project quality
由承包人总承包后续工程:按照设计院提供的图纸及设计要求,完成后续工程项目(见本工程内容) ,对后续项目采用包造价,包工料,包工期和包工程质量,完成整体的工艺流程。