×

单位工程 meaning in English

single project
unit construction
unit project

Examples

  1. The thesis introduces the theory of database design , and combined with the practical engineering , list all kind of data in unit project ^ departmental project and item project
    本文详细说明了数据库设计理论,结合本系统的实际情况,列出了质量评定过程中所涉及的各项数据,包括单位工程、分部工程及分项工程各个方面的数据。
  2. In the engineering construction , especially in hydraulic engineering , it possess the great meaning in using value engineering to ana lyze merit ability and economic performance of its unit engineering , individual engineering and certain production technology and material
    在生产工程项目这个产品中,尤其是水利工程项目产品中,应用价值工程对其单位工程、单项工程或某一个生产工艺及材料进行功能和经济效益价值分析,具有重大的意义。
  3. At last , combined with the practical project : yang jia wan 1 # bridge , which locate in k376 + 969 of the xiang wu section in xiang shi expressway , the analysis and establishment of the unit project departmental project and item project are described . the course of the quality estimation and exporting the report about these projects are introduced
    最后本文以襄十高速公路襄武段k376 + 969杨家湾1 #桥为例,具体描述了杨家湾1 #桥的单位、分部及分项工程划分和建立,分项、分部及单位工程质量评定的各个过程和分项、分部及单位工程质量检验评定表的输出过程。
  4. Main problems are the anti - slide test report and inspection record of high strength bolts that connecting structure steels have not been provided according to the requirement of design ; since there is no measurement certificate attached to the test report issued by the jincheng mine project quality inspection station of shanxi coal mine industry administration bureau , it will not be allowed to use these test reports as the one of unit project quality control documents
    主要是未按设计要求提供出钢架连接处高强度螺栓抗滑移系数试验报告和检测纪录;由山西省煤炭工业管理局晋城矿区工程质量检测站出具的试验报告无计量认证章,在今后的工程中不能再作为单位工程质量控制资料中的试验报告。
  5. From the viewpoint of method , the first step is to determine the available investment options or opportunity set of the locations of crude oil tankers zone involving some six representative factors such as the unit engineering expense , unit operating cost , constructing period , the location land features , unit constructing engineering amount , unit land opportunity cost . these factors stem from the economic , societal and environmental regulations and rules . the second step is to specify how to choose among these available options
    从方法上来看,首先确定以单位工程造价、单位运行成本、建设期、地形特征、单位土建工程量、单位土地机会成本等六个综合经济、社会及环境指标为代表的原油罐区方案决策目标集,其次制定桃园、西山、填海三个决策待选方案,然后建立基于优先关系的相对优属度矩阵及各影响因素的权重集,从而进行模糊动态规划评价,最后优选出最佳的桃园方案。

Related Words

  1. 单位根
  2. 单位根 (计量经济学)
  3. 单位工资单
  4. 单位工作
PC Version

Copyright © 2018 WordTech Co.