力不足的 meaning in English
hypodynamic
Examples
- The economy had reached a stage of overproduction , or under - consumption
经济进入生产过剩阶段,也就是说消费力不足的阶段。 - After re - exploration and careful analysis , it was found that the sand soil under the bottom of the pile and around the pile was disturbed during the construction of cfg piles
通过验证勘察并经综合分析后认为,造成单桩承载力不足的主要原因是施工时扰动了桩底或(及)桩周砂层。 - Based on checking preferences and regulations in - use , analysis and calculation for frame are done inthis paper , strengthing design and implements for the lacking of the capability members are also abopted
根据实测资料和现行规范对厂房框架结构进行内力分析、验算,对承载力不足的构件提出了加固设计方案,并实施了加固。 - Problems in using screw - crane in fields and water resources engineering were analysed with examples of engineering project . based on this , a method was presented . by using double - hook screw - crane and connecting two screw - cranes by an intermediate bearing and a gear coupling , the problem of inefficiency in door - closing was solved . the double - hook screw - crane could work synchronously
以具体工程为例,在分析了螺杆启闭机在农田水利工程中应用时存在的问题及原因的基础上,提出采用双吊点螺杆启闭机,用中间轴与齿轮联轴器把2台螺杆启闭机连接起来的方法,成功地解决了单吊点启闭机闭门力不足的问题,实现了双吊点螺杆启闭机工作时的同步 - Where the shoe pinches of the repair success is all right combination of young and old concrete . presently , most of the researches inside and outside country made the two into one to against force through felt . in practice , however , it ca n ' t obtain ideal bond capacity only depend on adherence . thus , this paper bring forward a young method to make up the lack of felt capacity - use mechanical joint element to link young and old concrete
新老混凝土之间的良好结合是混凝土修补成功的关键所在,目前国内外的研究中绝大部分是通过二者的粘结作用使其结合成为整体共同受力。而实际工程中仅仅依靠粘结力往往达不到理想的结合程度。因此,本文研究的是加强新老混凝土结合,弥补粘结力不足的一种新方法,即采用机械连接件将新老混凝土结合在一起的方法。