×

关键路径法 meaning in English

cpm critical path method
cpm=critical path method
critical path method cpm
critical path method,cpm
critical path method-cpm

Examples

  1. The realization of critical path method
    关键路径法的实现
  2. Cpm critical path method
    关键路径法
  3. Critical path method
    关键路径法
  4. Chapter 3 of this thesis discusses schedule management in detail , analyses some methods to make schedule plan , for example , gantt , cmp , and pert , points out their advantages and disadvantages . then the thesis puts forward a fuzzy program evaluation and review technique
    在第三章中,就项目管理中的进度管理进行了详细的讨论,分析了进度计划的几种主要方法(甘特图法、关键路径法、计划评审技术等) ,并指出了这几种方法的优缺点。
  5. Considering the np - complete problem , how to get the approximate optimized scheme of job - shop scheduling , and aimed at improving the efficiency of products and taking good advantage of concurrence , asynchronism , distributing and juxtaposition in multi - products and devices processing , we could divide the working procedures into the attached one which has the only precursor and subsequence and unattached one by analyzing working flow chart of job - shop , that is the working procedures are divided into two types , then the bf and the ff methods about memory scheduling in os are applied , therefore a new approximate optimized scheme is presented in the paper which could solve the common job - shop scheduling . namely , the acpm and the bfsm are applied to the classified and grouped working procedures considering the compact of the procedures and practical examples approved it . the results we analyzing and tested show that it is better than the heuristic algorithm common used , for less restriction terms , more satisfying algorithm complexity and better optimized results
    针对job - shop调度问题求最优解算法这一npc问题,本文以充分发挥多产品、多设备加工所具有并发性、异步性、分布性和并行性的加工优势,从而提高产品的加工效率为目标,对job - shop调度问题的工艺图进行适当分解,使工序在一定时间段或是为具有唯一紧前、紧后相关工序或是为独立工序,即将工序分两类,再结合操作系统中内存调度的最佳适应( bf )调度方法和首次适应( ff )调度方法的先进思想,通过分析提出了一种解决一般job - shop调度问题的全新近优解方案:在考虑关键设备上工序尽量紧凑的前提下,将工序分类、对这两类工序分批采用拟关键路径法( acpm )和最佳适应调度方法( bfsm )安排工序的算法,用实例加以验证,并给出结果甘特图。

Related Words

  1. 关键备件
  2. 关键区
  3. 关键相位
  4. 关键车流
  5. 关键绩效
  6. 关键原子
  7. 成功关键
  8. 关键步骤
  9. 关键日期
  10. 关键概念
  11. 关键路径调度程序
  12. 关键路径调度法
  13. 关键路径法,见cpm
  14. 关键路径法会计, 统筹法会计
PC Version

Copyright © 2018 WordTech Co.