×

修改通知单 meaning in English

variation order

Examples

  1. To be responsible for ecn development , revision , issue , register
    负责工程修改通知单的起草,审批,发放,登记的工作。
  2. All the work of this paper can be concluded as follows : 1 to research the ways of quota calculating 2 to build up the mode of data stream , analyze and introduce the work principle of system 3 to research of the structure of system and accomplish the function 4 to research the relationship between the system and tache of production and management , to research the pontes of system ( including man and computer , bom designing and maintenance system , capp , process aided designing system , others ) 5 to research the ways of software designing , database designing and accomplishment this system can finish the quota calculating and editing of parts and components , make requisition , examine and approve of the quota list and provide the data maintenance and management , and print various quota lists and classified collect lists
    本文主要进行了以下几方面的工作: 1 、材料消耗定额制订方法的研究2 、建立数据信息流程模型、系统的工作原理的分析和介绍3 、计算机辅助材料定额系统结构的研究开发与系统功能实现的研究4 、在工艺数字化系统中材料消耗定额与其他生产管理环节和系统的关系(包括人机接口、 capp系统接口、工艺行程辅助编制系统接口及其它系统接口)的研究5 、软件设计方法和系统数据库设计和结构实现的研究系统可以实现零部件主要材料和车间辅助材料消耗定额的计算机辅助编制、修订,修改通知单辅助生成。定额明细表浏览审批并提供定额制订基础数据维护管理功能,按要求打印输出各种定额明细表和分类汇总表。
  3. Before embedding of the foundation and embedment parts , technical clarificaiton will be don by the engineer in charge and the working group on the basis of design drawing 、 installation documentation 、 design amendment notification and supervision nofification 、 the principle of no impeded the progress schedule 、 the requirement of the relevant regulations and specification , setting out the embedment locaiton applied by the theodolite 、 water level and tape after that carrying on the embedment process and the record will be well kept
    以设计图纸、设备安装资料及设计修改通知单和监理通知单为依据,按规程规范的要求,以不影响工程进度为原则,由主管工程师对施工班组进行技术交底,利用经纬仪、水准仪和卷尺等测量工具放点定位进行基础及预埋件预埋并做好预埋记录。

Related Words

  1. 修改复审
  2. 各种修改
  3. 修改图
  4. 修改操作
  5. 软件修改
  6. 修改装置
  7. 修改率
  8. 修改指令
  9. 修改草案
  10. 工程设计修改
  11. 修改停机
  12. 修改通知
  13. 修改通知书
  14. 修改透支限额
PC Version

Copyright © 2018 WordTech Co.