×

人力不可抗力 meaning in English

force majeure

Examples

  1. Within 45 days after the arrival of the goods at the destination , should the quality , ecificatio or quantity be found not in conformity with the stipulatio of the contract except those claims for which the i urance company or the owners of the ve el are liable
    不可抗力:由于人力不可抗力的原由,发生在制造、装载或运输的过程中导致卖方延期交货或不能交货者,卖方可免除责任。
  2. Within 45 days after the arrival of the goods at the destination , should the quality , specifications or quantity be found not in conformity with the stipulations of the contract except those claims for which the insurance company or the owners of the vessel are liable
    不可抗力:由于人力不可抗力的原由,发生在制造、装载或的过程中导致卖方延期交货或不能交货者,卖方可免除责任。
  3. Within 45 days after the arrival of the goods at the destination , should the quality , specifications or quantity be found not in conformity with the stipulations of the contract except those claims for which the insurance company or the owners of the vessel are liable
    不可抗力:由于人力不可抗力的原由,发生在制造、装载或运输的过程中导致卖方延期交货或不能交货者,卖方可免除责任。

Related Words

  1. 不可抗力事故后的选择性终止
  2. 现有人力
  3. 人力银行
  4. 人力钻机
  5. 人力固结
  6. 康复人力
  7. 人力技术
  8. 人力清单
  9. 人力司
  10. 人力支付
  11. 人力不可抗拒
  12. 人力不可抗拒的事故
  13. 人力不足
  14. 人力部
PC Version

Copyright © 2018 WordTech Co.