专家评定 meaning in English
expert's statement
Examples
- It concludes that the result of fuzzy recognition and cluster is the same as the result of expert estimate through analyses of an example
并通过实例分析进行验证,模糊识别聚类结果与专家评定结果是相吻合的。 - Taking advantage of analytic hierarchy process and the result of bedding assessed by expert on all indexes , we can calculate the proportion . as long as we select the concrete content of all indexes at the time of repairing , we can assess whether repair is difficult or easy
利用层次分析模型,对各项指标经过专家评定,计算权重,只要选定维修时各指标中的具体内容,就可以评估该方案的维修难易程度。 - The purpose of the research is developing the adolescent coping with stress scale ( acss ) fit for chinese adolescents based on adolescent coping theory , opened question , previous researches , pretest , expert assessing et al . the dimensions and structure of the acss were examined through exploratory factor analysis ( efa ) & confirmatory factor analysis ( cfa )
因此,本研究拟在青少年应对理论与开放式问题的基础上,结合前人研究、预试和专家评定等多种方式,编制一个适合中国青少年的压力应对测评量表,通过探索性因素分析和验证性因素分析,探讨青少年压力应对的维度与结构,弥补国内这一领域的不足。 - Seven chapters are included in this thesis . the first chapter is the introduction about the necessity of bridge detection and common defect of the bridge . the second chapter introduces the structural basic condition and defect details of the bridge . the third chapter describes the preparation for the detection work . including the overall investigation of the diseases and the condition at operation , the set - up of loading test and control measures and structural computation . the 4th chapter is on - the - site detection , which consists of static and dynamic tests and necessary data collecting for analysis and evaluation . the 5th chapter is the analysis of detention data . according to collected data of loading tests , the results of static and dynamic tests are analyzed . the 6th chapter evaluates the strengths , rigidity . stability and dynamic characteristics of the bridge , so that the conclusion can be reached . the 7th chapter is summarization
第六章是检测评定结论,全面评定该桥的强度、刚度、稳定性和动力特性,从而给出检测评定结论。第七章是总结,在对本项目的工作内容和工作特点进行总结的基础上,指出了旧桥检测存在的问题以及今后发展的方向。同时,通过对本次检测工作的研究,初步形成了一套特大跨径旧钢桥的检测评定方法,即:全面的病害和运营状况调查、现实状况计算分析、制定加载试验方案和加载控制措施、加载试验、综合桥梁分析专家评定。 - Then , the concept of entropy was employed to get the objective weight of every index . finally , combining the subjective weight which made by the experts with the objective weight of every index , each biding project was synthetically evaluated . thus the rank - ordering and optimization of projects can be achieved
然后,引入熵信息的概念,确定各指标的客观权重,再结合专家评定的各指标的主观权重,对诸投标方案进行综合评定,最终实现投标方案的排序和优选。