上游围堰 meaning in English
upper coffer-wall
upstream cofferdam
Examples
- ( 2 ) validate whether the crest elevation can meet the require of energy dissipation and erosion prevention during the beginning period of flood discharge . ( 3 ) calculate the altitude of downriver cofferdam , and make it meet the require of energy dissipation and erosion prevention . ( 4 ) calculate some average velocity of flow through some sections , including contracted section in stilling basins behind upriver cofferdam , if the hydraulic jump happen in lower reaches of the river . the program will calculate the average velocity of flow of contracted section and the length of the apron
主要设计内容包括:计算上游围堰后消力池的尺寸;验证泄洪初期坝面高程是否能够满足消能防冲需要;计算下游围堰堰顶高程,使其满足泄洪期围堰和坝体过流的消能防冲和工程进度的需要;计算部分断面平均流速,包括:上游围堰后消力池中收缩断面的断面平均流速;坝首和坝末的断面平均流速;当下游河道发生水跃时,计算下游河道的收缩断面平均流速及需要铺设护坦的长度。