×

hydroplant meaning in English

水电厂

Examples

  1. Study on relation between energy output with power unit ' s capacity of three - gorge hydroplant
    三峡电站单机容量与发电量的关系研究
  2. Economic dispatching of series hydroplant system plays an important role for optimal operation of power grid . appropriate scheduling of the series hydroplants is vital to the security , stability and economic operation of the whole power system
    梯级水电站群经济调度是电网优化运行的重要组成部分,正确、合理的安排梯级水电站群的运行方式对整个电网的安全、稳定、经济运行至关重要。
  3. With the development of the electric power system , static - state reactive power compensators ca n ' t have met the requirements of the actual production and operation , and the trend to the fast and dynamic compensation for reactive power become greater and greater . since ertan hydroplant and 500kv transmission systems in sichuan power system have been operated , many power plants of load center are forced to halt during the high - water period , because the great deal of power is transmitted to far - distance load center . thus the load center loses voltage sustentation and the level of the system stabilization is debased greatly
    四川电网的二滩水电站和500kv输变电系统投入运行后,由于二滩水电站的大量电力远距离输送至负荷中心,迫使负荷中心的火电机组在丰水期大量停机,使负荷中心失去电压支撑,大大降低了电网的电压稳定水平;同时,因为四川电网中的无功补偿装置全为静态无功补偿电容器(或电抗器) ,这些设备只能在系统正常运行状态下起到无功补偿和电压支撑的作用,而在电网出现事故时,不但不能起到电压支撑作用,反而会促使电网电压崩溃事故的发生。
  4. The construction techniques and mechanics are approaching or even reaching the international advanced level in the asphalt concrete impervious deck of the recent completed tianhuangping pumped - storage hydroplant and the counter dam in the yangtze river which is being built with the height of 104 m , the volume of asphalt concrete core of 5x104m3
    最近建成的天荒坪抽水蓄能电站上库沥青混凝土防渗面板和正在建设的坝高104m 、沥青混凝土心墙方量达5万多m ~ 3的长江三峡水利枢纽茅坪溪防护坝工程,施工工艺和施工机械化程度已达到或接近国际先进水平。
  5. The vibration problems in pumped storage hydroplant are outstanding , due to their high - velocity flow , high - speed units , etc . on the base of summarizing the development of inverse analysis methods , this paper proposed a dynamic inverse model for underground hydroplant was built , combining the modal analysis and inverse numerical computation
    点,提出采用实验模态分析与动力反演分析相结合,以试验模态与计算模态某种偏差为目标函数,建立通用的结构最优化动力反分析模型。引入改进的遗传算法,实现了其与ansys软件的接口。
More:   Next

Related Words

  1. base load hydroplant
  2. hydroplaning; viscous
  3. hydroplankton
  4. hydroplanula
  5. hydroplasm
PC Version

Copyright © 2018 WordTech Co.